D.F. Pray completed construction on roughly 90,185 sq. ft. of plant additions and renovations. The new spaces include: dry storage, utilities block, silo alley, and process renovations. The work also
included selective demolition and site work.
The Dry Storage building addition is a traditional post-and-beam structure with exterior structural concrete panels approx. 34’ high at the parapet. The Utilities Block building addition is also a traditional post-and-beam structure approx. 28’ high at the parapet and includes an electrical room and Pasteurized CIP room. Silo alley is a 470 sq. ft. insulated concrete wall panel bearing structure approx. 17’ high at the roof.
Process renovations include a new maintenance room, powder dump, ante room, redline rooms, control room, aseptic surge, and aseptic filling room, a new corridor, retains cooler, hot box, and quality control lab. Additional work was completed in the existing process area and existing cooler. A roughly 1,500 sq.ft. second floor was constructed over the maintenance, powder dump, ante room, control room, and redline room. The second floor contains manufacturing offices and the server room.
Project Highlights
- Multiple Additions